Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
ELEC0231-007 Effective 06/05/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | $40.68 | $19.70 | $60.38 |
SUNE2011-025 Effective 08/29/2011 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: WATER TRUCK | $18.00 | $6.40 | $24.40 |
| TRUCK DRIVER: SEMI-TRAILER TRUCK | $14.39 | $0.00 | $14.39 |
| TRUCK DRIVER: LOWBOY TRUCK | $19.26 | $6.40 | $25.66 |
| TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK | $15.71 | $6.40 | $22.11 |
| OPERATOR: TRACTOR | $13.11 | $0.00 | $13.11 |
| OPERATOR: SCRAPER | $16.49 | $0.00 | $16.49 |
| OPERATOR: ROLLER | $16.96 | $6.75 | $23.71 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $19.49 | $6.75 | $26.24 |
| OPERATOR: OILER | $16.77 | $6.75 | $23.52 |
| OPERATOR: MILLING MACHINE | $12.80 | $0.00 | $12.80 |
| OPERATOR: MECHANIC | $22.44 | $6.75 | $29.19 |
| OPERATOR: LOADER | $18.63 | $6.75 | $25.38 |
| OPERATOR: HYDROHAMMER | $17.03 | $0.00 | $17.03 |
| OPERATOR: GRADER/BLADE | $18.95 | $6.75 | $25.70 |
| OPERATOR: CRANE | $23.45 | $6.75 | $30.20 |
| OPERATOR: COMPACTOR | $18.66 | $6.75 | $25.41 |
| OPERATOR: BULLDOZER | $18.20 | $6.59 | $24.79 |
| OPERATOR: BROOM/SWEEPER | $13.21 | $0.00 | $13.21 |
| OPERATOR: BACKHOE/EXCAVATOR | $20.76 | $6.56 | $27.32 |
| OPERATOR: BACKHOE LOADER COMBO | $15.94 | $0.00 | $15.94 |
| OPERATOR: ASPHALT SPREADER | $20.25 | $0.00 | $20.25 |
| OPERATING ENGINEERS: (SKID LOADER) | $15.19 | $6.75 | $21.94 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $10.44 | $0.00 | $10.44 |
| LABORER: CONCRETE SAW (HAND HELD/WALK BEHIND) | $16.07 | $6.55 | $22.62 |
| LABORER: COMMON OR GENERAL | $14.82 | $6.35 | $21.17 |
| IRONWORKER, REINFORCING | $22.49 | $9.20 | $31.69 |
| HIGHWAY/PARKING LOT STRIPING: LABORER | $12.37 | $0.00 | $12.37 |
| CEMENT MASON/CONCRETE FINISHER | $18.95 | $3.00 | $21.95 |
| CARPENTER, INCLUDES FORM WORK | $21.25 | $6.78 | $28.03 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 0 | 01/02/2026 |
| 1 | 05/18/2026 |
Counties Covered
This wage determination applies to 2 counties in Nebraska.
Get notified when NE20260029 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.