NM20260035
HighwayDavis-Bacon Act general wage determination for highway construction in New Mexico.
Track NM20260035
Get an email when this wage determination gets a new modification.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
ELEC0611-003 Effective 07/01/2014 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (BOOM OPERATOR) | $29.79 | $12.74 | $42.53 |
SUNM2011-003 Effective 08/25/2011 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: WATER TRUCK | $13.51 | $1.51 | $15.02 |
| TRUCK DRIVER: PICKUP TRUCK (SAN JUAN) | $12.95 | $0.26 | $13.21 |
| TRUCK DRIVER: PICKUP TRUCK (DONA ANA) | $12.14 | $0.26 | $12.40 |
| TRUCK DRIVER: DUMP TRUCK (DONA ANA) | $15.04 | $0.26 | $15.30 |
| TRUCK DRIVER (FLATBED TRUCK) | $13.30 | $0.26 | $13.56 |
| POWER EQUIPMENT OPERATOR: TRENCHER (SAN JUAN) | $15.93 | $0.26 | $16.19 |
| POWER EQUIPMENT OPERATOR: TRENCHER (DONA ANA) | $15.22 | $0.26 | $15.48 |
| POWER EQUIPMENT OPERATOR: ROLLER (ASPHALT AND DIRT) (SAN JUAN) | $12.91 | $1.60 | $14.51 |
| POWER EQUIPMENT OPERATOR: ROLLER (ASPHALT AND DIRT) (DONA ANA) | $16.27 | $1.51 | $17.78 |
| POWER EQUIPMENT OPERATOR: OILER | $22.08 | $8.72 | $30.80 |
| POWER EQUIPMENT OPERATOR: MECHANIC | $23.24 | $1.51 | $24.75 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $17.64 | $1.51 | $19.15 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER | $14.56 | $0.26 | $14.82 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (SAN JUAN) | $16.27 | $1.51 | $17.78 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (DONA ANA) | $17.74 | $0.26 | $18.00 |
| POWER EQUIPMENT OPERATOR: POWER EQUIPMENT OPERATOR: (PILEDRIVER) | $16.26 | $0.26 | $16.52 |
| POWER EQUIPMENT OPERATOR: POWER EQUIPMENT OPERATOR: (LOADER(FRONT END)) | $16.53 | $0.26 | $16.79 |
| POWER EQUIPMENT OPERATOR: POWER EQUIPMENT OPERATOR: (BROOM SWEEPER) | $16.67 | $1.57 | $18.24 |
| POWER EQUIPMENT OPERATOR: LABORER: PIPELAYER | $17.13 | $5.04 | $22.17 |
| POWER EQUIPMENT OPERATOR: LABORER: MASON TENDER-CEMENT/CONCRETE | $10.25 | $0.35 | $10.60 |
| POWER EQUIPMENT OPERATOR: LABORER: COMMON OR GENERAL (SAN JUAN) | $11.48 | $0.35 | $11.83 |
| POWER EQUIPMENT OPERATOR: LABORER, COMMON OR GENERAL (DONA ANA) | $11.95 | $0.35 | $12.30 |
| POWER EQUIPMENT OPERATOR: LABORER (FLAGGER/CONE SETTER) | $14.27 | $0.35 | $14.62 |
| POWER EQUIPMENT OPERATOR: IRONWORKER, REINFORCING (SAN JUAN) | $16.41 | $5.85 | $22.26 |
| POWER EQUIPMENT OPERATOR: IRONWORKER, REINFORCING (DONA ANA) | $22.61 | $6.03 | $28.64 |
| POWER EQUIPMENT OPERATOR: HIGHWAY/PARKING LOT STRIPING: INCLUDES HIGHWAY LINE/PARKING LOT LINE STRIPING AND LINE STRIPING TRUCK DRIVER (SAN JUAN) | $14.39 | $0.35 | $14.74 |
| POWER EQUIPMENT OPERATOR: HIGHWAY/PARKING LOT STRIPING: INCLUDES HIGHWAY LINE/PARKING LOT LINE STRIPING AND LINE STRIPING TRUCK DRIVER (DONA ANA) | $15.44 | $0.35 | $15.79 |
| POWER EQUIPMENT OPERATOR: ELECTRICIAN, INCLUDES TRAFFIC SIGNALIZATION AND INSTALLATION (SAN JUAN) | $24.46 | $8.56 | $33.02 |
| POWER EQUIPMENT OPERATOR: ELECTRICIAN, INCLUDES TRAFFIC SIGNALIZATION AND INSTALLATION (DONA ANA) | $25.91 | $9.45 | $35.36 |
| POWER EQUIPMENT OPERATOR: CEMENT MASON/CONCRETE FINISHER | $13.65 | $0.26 | $13.91 |
| POWER EQUIPMENT OPERATOR: CARPENTER, INCLUDES FORM WORK (SAN JUAN) | $13.42 | $0.44 | $13.86 |
| POWER EQUIPMENT OPERATOR: CARPENTER, INCLUDES FORM WORK (DONA ANA) | $14.15 | $0.44 | $14.59 |
TEAM0492-003 Effective 04/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: DUMP (SAN JUAN) | $21.70 | $9.65 | $31.35 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 0 | 01/02/2026 |
| 1 | 05/18/2026 |
Counties Covered
This wage determination applies to 2 counties in New Mexico.
Get notified when NM20260035 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.