WV20260033

Building

Davis-Bacon Act general wage determination for building construction in West Virginia.

Modification 0, revised 05/18/2026 49 trade rates 5 counties View on SAM.gov

Track WV20260033

Get an email when this wage determination gets a new modification.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Wage Rates

Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.

ASBE0080-002 Effective 02/24/2025
Trade Rate Fringe Total
ASBESTOS WORKER/HEAT & FROST INSULATOR $38.05 $30.87 $68.92
BOIL0667-005 Effective 01/01/2025
Trade Rate Fringe Total
BOILERMAKER $47.13 $28.93 $76.06
BRWV0009-001 Effective 12/01/2022
Trade Rate Fringe Total
BRICK POINTER/CAULKER/CLEANER $31.65 $25.56 $57.21
BRWV0015-010 Effective 06/01/2024
Trade Rate Fringe Total
MASON - STONE $33.00 $26.18 $59.18
CARP0443-009 Effective 06/01/2023
Trade Rate Fringe Total
MILLWRIGHT $37.40 $26.06 $63.46
CARP1024-001 Effective 06/01/2023
Trade Rate Fringe Total
CARPENTER (SCAFFOLD BUILDER ONLY) $30.00 $21.15 $51.15
CARP1911-004 Effective 05/01/2023
Trade Rate Fringe Total
CARPENTER (FLOOR LAYING - CARPET, HARDWOOD, RESILIENT AND VINYL ONLY) $30.00 $21.15 $51.15
ENGI0132-007 Effective 12/01/2024
Trade Rate Fringe Total
POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID STEER/SKID LOADER, ROLLER, OILER $34.71 $22.05 $56.76
POWER EQUIPMENT OPERATOR: GROUP 3 BACKHOE, ALL OTHER CRANES $45.21 $22.05 $67.26
POWER EQUIPMENT OPERATOR: GROUP 2 OPERATING CRANES AND TOWER CRANES WITH A LIFTING CAPACITY OF 15 TONS AND OVER $46.21 $22.05 $68.26
IRON0549-006 Effective 12/01/2022
Trade Rate Fringe Total
IRONWORKER: ORNAMENTAL $35.19 $25.66 $60.85
IRON0787-006 Effective 12/01/2025
Trade Rate Fringe Total
IRONWORKER: REINFORCING $36.10 $24.65 $60.75
LABO0379-019 Effective 12/01/2023
Trade Rate Fringe Total
LABORER (WACKER ROLLER OPERATOR) $28.02 $16.80 $44.82
LABO0453-009 Effective 12/01/2017
Trade Rate Fringe Total
LABORER: GROUTING $22.76 $16.75 $39.51
LABORER: CONCRETE SAW (HAND HELD/WALK BEHIND) $22.76 $16.75 $39.51
LABORER: CHIPPING GUNS $22.76 $16.75 $39.51
LABO0543-003 Effective 06/01/2020
Trade Rate Fringe Total
LABORER: ASPHALT RAKER, JACK HAMMER, MOTORIZED BUGGY OPERATOR, WATER BOY $25.41 $16.75 $42.16
LABO0984-005 Effective 12/01/2023
Trade Rate Fringe Total
PLASTERER $24.13 $16.05 $40.18
PAIN0970-007 Effective 12/01/2024
Trade Rate Fringe Total
PAINTER: DRYWALL FINISHING/TAPING $30.57 $20.06 $50.63
PAIN1195-002 Effective 12/01/2024
Trade Rate Fringe Total
GLAZIER $32.89 $13.38 $46.27
PLAS0926-008 Effective 06/01/2023
Trade Rate Fringe Total
LABORER GROUP 2 (Concrete Saw (Hand Held/Walk Behind), Grouting) $31.97 $25.36 $57.33
LABORER GROUP 2 (Airtool Operator, Asbestos Abatement (Removal from Floors, Walls, and Ceiling), Bobcat Operator (Clean up/Demolition), Dewatering, Rodman, Skytrak Forklift Operator) $34.77 $26.66 $61.43
CEMENT MASON/CONCRETE FINISHER $34.77 $26.66 $61.43
LABORER GROUP 2 (Concrete Saw (Hand Held/Walk Behind), Grouting) $31.97 $25.36 $57.33
LABORER GROUP 2 (Airtool Operator, Asbestos Abatement (Removal from Floors, Walls, and Ceiling), Bobcat Operator (Clean up/Demolition), Dewatering, Rodman, Skytrak Forklift Operator) $34.77 $26.66 $61.43
CEMENT MASON/CONCRETE FINISHER $34.77 $26.66 $61.43
PLAS0926-008 Effective 06/01/2024
Trade Rate Fringe Total
LABORER GROUP 2 (Concrete Saw (Hand Held/Walk Behind), Grouting) $31.97 $25.36 $57.33
LABORER GROUP 2 (Airtool Operator, Asbestos Abatement (Removal from Floors, Walls, and Ceiling), Bobcat Operator (Clean up/Demolition), Dewatering, Rodman, Skytrak Forklift Operator) $34.77 $26.66 $61.43
CEMENT MASON/CONCRETE FINISHER $34.77 $26.66 $61.43
LABORER GROUP 2 (Concrete Saw (Hand Held/Walk Behind), Grouting) $31.97 $25.36 $57.33
LABORER GROUP 2 (Airtool Operator, Asbestos Abatement (Removal from Floors, Walls, and Ceiling), Bobcat Operator (Clean up/Demolition), Dewatering, Rodman, Skytrak Forklift Operator) $34.77 $26.66 $61.43
CEMENT MASON/CONCRETE FINISHER $34.77 $26.66 $61.43
SUWV2012-031 Effective 08/13/2012
Trade Rate Fringe Total
TRUCK DRIVER: SINGLE AND DOUBLE AXLE DUMP TRUCKS $28.52 $3.00 $31.52
SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION $25.61 $15.68 $41.29
ROOFER $24.28 $9.32 $33.60
PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION $27.64 $18.09 $45.73
PAINTER: BRUSH, ROLLER AND SPRAY $22.03 $9.95 $31.98
OPERATOR: FORKLIFT $33.09 $3.00 $36.09
OPERATOR: EXCAVATOR $30.31 $10.81 $41.12
OPERATOR: BULLDOZER $30.24 $10.26 $40.50
LABORER: MASON TENDER - CEMENT/CONCRETE $22.05 $8.54 $30.59
LABORER: MASON TENDER - BRICK $21.47 $8.29 $29.76
LABORER: DEMOLITION $20.58 $9.47 $30.05
LABORER: COMMON OR GENERAL $20.66 $8.78 $29.44
IRONWORKER, STRUCTURAL $26.01 $12.18 $38.19
ELECTRICIAN $28.16 $15.11 $43.27
CARPENTER, ALL OTHER WORK $25.62 $11.90 $37.52
CARPENTER (DRYWALL HANGING ONLY) $25.08 $12.58 $37.66
BRICKLAYER $27.50 $12.35 $39.85

Modification History

Modification Publication Date
0 01/02/2026
1 05/18/2026

Counties Covered

This wage determination applies to 5 counties in West Virginia.

Get notified when WV20260033 is modified

This determination has been revised 2 times. We'll email you when a new modification is published.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.