OK20260017
rev 0Highway
0 trades
Applies to
Creek, Okmulgee, Osage, Pawnee, Rogers, Tulsa, Wagoner in Oklahoma.
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Click any row to save it for later
| Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER Residential BROK0005-001 | $25.92 | $11.89 | $37.81 |
| CARPENTER Highway SUOK2011-004 (Includes Form Work, and Curb Line Formsetting) Remaining Counties | $13.24 | $0.00 | $13.24 |
| CARPENTER Residential SUOK2017-006 | $14.98 | 0.00 | $14.98 |
| CEMENT MASON/CONCRETE FINISHER Heavy SUOK2012-008 | $14.00 | $3.95 | $17.95 |
| CEMENT MASON/CONCRETE FINISHER Residential SUOK2017-006 | $18.57 | 0.00 | $18.57 |
| CEMENT MASON/CONCRETE FINISHER Remaining Counties Highway SUOK2011-004 | $13.36 | $0.00 | $13.36 |
| ELECTRICIAN Heavy ELEC1002-005 | $51.00 | $8.75 | $59.75 |
| ELECTRICIAN Residential SUOK2017-006 | $19.08 | 0.00 | $19.08 |
| FORM WORKER Heavy SUOK2012-008 | $11.77 | 0.00 | $11.77 |
| IRONWORKER Heavy IRON0584-019 (Structural, Reinforcing, and Ornamental) | $30.35 | $16.83 | $47.18 |
| IRONWORKER, REINFORCING Highway SUOK2011-004 | $15.38 | $0.00 | $15.38 |
| IRONWORKER, STRUCTURAL Highway SUOK2011-004 | $14.21 | $0.00 | $14.21 |
| IRONWORKER, STRUCTURAL Residential SUOK2017-006 | $17.10 | $4.22 | $21.32 |
| LABORER Asphalt Raker and Shoveler Remaining Counties Highway SUOK2011-004 | $12.40 | $1.57 | $13.97 |
| LABORER: Common or General Heavy SUOK2012-008 | $11.78 | $2.76 | $14.54 |
| LABORER: Common or General Residential SUOK2017-006 | $12.50 | 0.00 | $12.50 |
| LABORER: Pipelayer Heavy SUOK2012-008 | $12.94 | $2.42 | $15.36 |
| Landscape Highway SUOK2011-004 | $8.67 | $0.00 | $8.67 |
| OPERATOR: Backhoe/Excavator Heavy SUOK2012-008 | $16.62 | $3.10 | $19.72 |
| OPERATOR: Backhoe/Excavator/Trackhoe Residential SUOK2017-006 | $17.02 | $10.00 | $27.02 |
| OPERATOR: Bulldozer Heavy SUOK2012-008 | $17.98 | $1.75 | $19.73 |
| OPERATOR: Drill Heavy SUOK2012-008 | $17.15 | $0.78 | $17.93 |
| OPERATOR: Grader/Blade Heavy SUOK2012-008 | $17.76 | $3.87 | $21.63 |
| OPERATOR: Loader (Front End) Heavy SUOK2012-008 | $14.01 | 0.00 | $14.01 |
| OPERATOR: Mechanic Heavy SUOK2012-008 | $19.61 | $9.39 | $29.00 |
| OPERATOR: PLUMBER Residential SUOK2017-006 | $33.14 | 0.00 | $33.14 |
| OPERATOR: Scraper Heavy SUOK2012-008 | $16.00 | $1.55 | $17.55 |
| OPERATOR: Trackhoe Heavy SUOK2012-008 | $18.54 | $2.78 | $21.32 |
| Pipelayer Highway SUOK2011-004 | $12.35 | $0.00 | $12.35 |
| POWER EQUIPMENT OPERATOR: Asphalt Paver Screed Highway SUOK2011-004 | $12.96 | $0.00 | $12.96 |
| POWER EQUIPMENT OPERATOR: Asphalt Paving Machine Highway SUOK2011-004 | $13.95 | $2.75 | $16.70 |
| POWER EQUIPMENT OPERATOR: Backhoe/Trackhoe Remaining Counties Highway SUOK2011-004 | $15.16 | $0.00 | $15.16 |
| POWER EQUIPMENT OPERATOR: Bobcat/Skid Loader Highway SUOK2011-004 | $12.24 | $0.00 | $12.24 |
| POWER EQUIPMENT OPERATOR: Broom Highway SUOK2011-004 | $11.97 | $0.00 | $11.97 |
| POWER EQUIPMENT OPERATOR: Bulldozer Highway SUOK2011-004 | $14.28 | $0.00 | $14.28 |
| POWER EQUIPMENT OPERATOR: Concrete Paving Machine Highway SUOK2011-004 | $14.11 | $0.00 | $14.11 |
| POWER EQUIPMENT OPERATOR: Concrete Saw Highway SUOK2011-004 | $11.94 | $0.00 | $11.94 |
| POWER EQUIPMENT OPERATOR: Crane Highway SUOK2011-004 | $17.45 | $0.00 | $17.45 |
| POWER EQUIPMENT OPERATOR: Distributor Truck Highway SUOK2011-004 | $13.34 | $0.00 | $13.34 |
| POWER EQUIPMENT OPERATOR: Excavator Highway SUOK2011-004 | $14.99 | $0.00 | $14.99 |
| POWER EQUIPMENT OPERATOR: Flatbed Truck Highway SUOK2011-004 | $14.69 | $0.00 | $14.69 |
| POWER EQUIPMENT OPERATOR: Grader/Blade Highway SUOK2011-004 | $16.68 | $0.00 | $16.68 |
| POWER EQUIPMENT OPERATOR: Group 1 Heavy ENGI0627-014 | $38.09 | $19.05 | $57.14 |
| POWER EQUIPMENT OPERATOR: Group 2 Heavy ENGI0627-014 | $36.14 | $19.05 | $55.19 |
| POWER EQUIPMENT OPERATOR: Group 3 Heavy ENGI0627-014 | $35.40 | $19.05 | $54.45 |
| POWER EQUIPMENT OPERATOR: Group 4 Heavy ENGI0627-014 | $34.07 | $19.05 | $53.12 |
| POWER EQUIPMENT OPERATOR: Group 6 Heavy ENGI0627-014 | $30.87 | $19.05 | $49.92 |
| POWER EQUIPMENT OPERATOR: Group10 Heavy ENGI0627-014 | $27.25 | $19.05 | $46.30 |
| POWER EQUIPMENT OPERATOR: Loader (Front End) Highway SUOK2011-004 | $13.81 | $0.00 | $13.81 |
| POWER EQUIPMENT OPERATOR: Lowboy/Float Highway SUOK2011-004 | $13.80 | $0.00 | $13.80 |
| POWER EQUIPMENT OPERATOR: Mechanic Highway SUOK2011-004 | $17.46 | $0.00 | $17.46 |
| POWER EQUIPMENT OPERATOR: Milling Machine Highway SUOK2011-004 | $14.56 | $0.00 | $14.56 |
| POWER EQUIPMENT OPERATOR: Mixer Highway SUOK2011-004 | $14.43 | $0.00 | $14.43 |
| POWER EQUIPMENT OPERATOR: Off the Road Truck Highway SUOK2011-004 | $13.40 | $0.00 | $13.40 |
| POWER EQUIPMENT OPERATOR: Oiler Highway SUOK2011-004 | $15.28 | $0.00 | $15.28 |
| POWER EQUIPMENT OPERATOR: Pickup Truck Highway SUOK2011-004 | $12.32 | $0.00 | $12.32 |
| POWER EQUIPMENT OPERATOR: Roller (Asphalt) Highway SUOK2011-004 | $12.79 | $0.00 | $12.79 |
| POWER EQUIPMENT OPERATOR: Roller (Dirt Compaction) Highway SUOK2011-004 | $11.71 | $0.00 | $11.71 |
| POWER EQUIPMENT OPERATOR: Scraper Highway SUOK2011-004 | $13.34 | $0.00 | $13.34 |
| POWER EQUIPMENT OPERATOR: Striping Machine Highway SUOK2011-004 | $11.94 | $0.00 | $11.94 |
| POWER EQUIPMENT OPERATOR: Tandem Axle/Semi Trailer Remaining Counties Highway SUOK2011-004 | $16.36 | $0.00 | $16.36 |
| POWER EQUIPMENT OPERATOR: Tractor/Box Blade Highway SUOK2011-004 | $13.67 | $0.00 | $13.67 |
| POWER EQUIPMENT OPERATOR: Trencher Highway SUOK2011-004 | $13.87 | $0.00 | $13.87 |
| POWER EQUIPMENT OPERATOR: TRUCK DRIVER Dump Truck Highway SUOK2011-004 | $13.97 | $0.00 | $13.97 |
| POWER EQUIPMENT OPERATOR: Water Truck Highway SUOK2011-004 | $12.00 | $0.00 | $12.00 |
| Power Tool Operator Highway SUOK2011-004 (Includes Chipping Guns and Handheld Concrete Saws) | $12.89 | $0.00 | $12.89 |
| Remaining Counties Highway SUOK2011-004 | $10.70 | $0.00 | $10.70 |
| Traffic Control Highway SUOK2011-004 (Includes Flagger, Setting Up and Moving Cones/Barrels) Remaining Counties | $11.05 | $0.00 | $11.05 |
| Traffic signal installer Highway SUOK2011-004 | $18.04 | $0.00 | $18.04 |
| TRUCK DRIVER: Dump Truck Heavy SUOK2012-008 | $14.64 | $1.71 | $16.35 |
| Wagoner Highway SUOK2011-004 | $10.32 | $0.00 | $10.32 |
No trade rates match your search and filter selection.
Highway
Applies to
Creek, Okmulgee, Osage, Pawnee, Rogers, Tulsa, Wagoner in Oklahoma.
Heavy
Applies to
Creek, Okmulgee, Osage, Pawnee, Rogers, Wagoner in Oklahoma.
Residential
Applies to
Creek, Okmulgee in Oklahoma.