Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
SUOK2011-004 Effective 04/18/2011 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: TANDEM AXLE/SEMI TRAILER (TULSA COUNTY) | $18.01 | $0.00 | $18.01 |
| TRUCK DRIVER: TANDEM AXLE/SEMI TRAILER (ROGERS COUNTY) | $14.01 | $0.31 | $14.32 |
| TRUCK DRIVER: TANDEM AXLE/SEMI TRAILER (REMAINING COUNTIES) | $16.36 | $0.00 | $16.36 |
| TRUCK DRIVER (WATER TRUCK) | $12.00 | $0.00 | $12.00 |
| TRUCK DRIVER (PICKUP TRUCK) | $12.32 | $0.00 | $12.32 |
| TRUCK DRIVER (OFF THE ROAD TRUCK) | $13.40 | $0.00 | $13.40 |
| TRUCK DRIVER (LOWBOY/FLOAT) | $13.80 | $0.00 | $13.80 |
| TRUCK DRIVER (FLATBED TRUCK) | $14.69 | $0.00 | $14.69 |
| TRUCK DRIVER (DUMP TRUCK) | $13.97 | $0.00 | $13.97 |
| TRAFFIC SIGNAL INSTALLER | $18.04 | $0.00 | $18.04 |
| POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE (TULSA COUNTY) | $15.19 | $0.00 | $15.19 |
| POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE (ROGERS COUNTY) | $15.11 | $0.00 | $15.11 |
| POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE (REMAINING COUNTIES) | $15.16 | $0.00 | $15.16 |
| POWER EQUIPMENT OPERATOR: (TRENCHER) | $13.87 | $0.00 | $13.87 |
| POWER EQUIPMENT OPERATOR: (TRACTOR/BOX BLADE) | $13.67 | $0.00 | $13.67 |
| POWER EQUIPMENT OPERATOR: (STRIPING MACHINE) | $11.94 | $0.00 | $11.94 |
| POWER EQUIPMENT OPERATOR: (SCRAPER) | $13.34 | $0.00 | $13.34 |
| POWER EQUIPMENT OPERATOR: (ROLLER (DIRT COMPACTION)) | $11.71 | $0.00 | $11.71 |
| POWER EQUIPMENT OPERATOR: (ROLLER (ASPHALT)) | $12.79 | $0.00 | $12.79 |
| POWER EQUIPMENT OPERATOR: (OILER) | $15.28 | $0.00 | $15.28 |
| POWER EQUIPMENT OPERATOR: (MIXER) | $14.43 | $0.00 | $14.43 |
| POWER EQUIPMENT OPERATOR: (MILLING MACHINE) | $14.56 | $0.00 | $14.56 |
| POWER EQUIPMENT OPERATOR: (MECHANIC) | $17.46 | $0.00 | $17.46 |
| POWER EQUIPMENT OPERATOR: (LOADER (FRONT END)) | $13.81 | $0.00 | $13.81 |
| POWER EQUIPMENT OPERATOR: (GRADER/BLADE) | $16.68 | $0.00 | $16.68 |
| POWER EQUIPMENT OPERATOR: (EXCAVATOR) | $14.99 | $0.00 | $14.99 |
| POWER EQUIPMENT OPERATOR: (DISTRIBUTOR TRUCK) | $13.34 | $0.00 | $13.34 |
| POWER EQUIPMENT OPERATOR: (CRANE) | $17.45 | $0.00 | $17.45 |
| POWER EQUIPMENT OPERATOR: (CONCRETE SAW) | $11.94 | $0.00 | $11.94 |
| POWER EQUIPMENT OPERATOR: (CONCRETE PAVING MACHINE) | $14.11 | $0.00 | $14.11 |
| POWER EQUIPMENT OPERATOR: (BULLDOZER) | $14.28 | $0.00 | $14.28 |
| POWER EQUIPMENT OPERATOR: (BROOM) | $11.97 | $0.00 | $11.97 |
| POWER EQUIPMENT OPERATOR: (BOBCAT/SKID LOADER) | $12.24 | $0.00 | $12.24 |
| POWER EQUIPMENT OPERATOR: (ASPHALT PAVING MACHINE) | $13.95 | $2.75 | $16.70 |
| POWER EQUIPMENT OPERATOR: (ASPHALT PAVER SCREED) | $12.96 | $0.00 | $12.96 |
| LABORER, TRAFFIC CONTROL (INCLUDES FLAGGER, SETTING UP AND MOVING CONES/BARRELS) (TULSA COUNTY) | $10.94 | $0.00 | $10.94 |
| LABORER, TRAFFIC CONTROL (INCLUDES FLAGGER, SETTING UP AND MOVING CONES/BARRELS) (REMAINING COUNTIES) | $11.05 | $0.00 | $11.05 |
| LABORER, COMMON OR GENERAL (WAGONER) | $10.32 | $0.00 | $10.32 |
| LABORER, COMMON OR GENERAL (TULSA COUNTY) | $10.84 | $0.00 | $10.84 |
| LABORER, COMMON OR GENERAL (ROGERS COUNTY) | $10.14 | $0.00 | $10.14 |
| LABORER, COMMON OR GENERAL (REMAINING COUNTIES) | $10.70 | $0.00 | $10.70 |
| LABORER, COMMON OR GENERAL (CREEK COUNTY) | $10.95 | $0.00 | $10.95 |
| LABORER, ASPHALT RAKER AND SHOVELER (ROGERS COUNTY) | $11.76 | $1.57 | $13.33 |
| LABORER, ASPHALT RAKER AND SHOVELER (REMAINING COUNTIES) | $12.40 | $1.57 | $13.97 |
| LABORER (POWER TOOL OPERATOR (INCLUDES CHIPPING GUNS AND HANDHELD CONCRETE SAWS)) | $12.89 | $0.00 | $12.89 |
| LABORER (PIPELAYER) | $12.35 | $0.00 | $12.35 |
| LABORER (LANDSCAPE) | $8.67 | $0.00 | $8.67 |
| IRONWORKER: REINFORCING | $15.38 | $0.00 | $15.38 |
| IRONWORKER, STRUCTURAL | $14.21 | $0.00 | $14.21 |
| CEMENT MASON/CONCRETE FINISHER (TULSA COUNTY) | $13.44 | $0.00 | $13.44 |
| CEMENT MASON/CONCRETE FINISHER (REMAINING COUNTIES) | $13.36 | $0.00 | $13.36 |
| CARPENTER, INCLUDES FORM WORK, AND CURB LINE FORMSETTING (TULSA COUNTY) | $12.80 | $0.00 | $12.80 |
| CARPENTER, INCLUDES FORM WORK, AND CURB LINE FORMSETTING (ROGERS COUNTY) | $14.82 | $0.00 | $14.82 |
| CARPENTER, INCLUDES FORM WORK, AND CURB LINE FORMSETTING (REMAINING COUNTIES) | $13.24 | $0.00 | $13.24 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 0 | 01/02/2026 |
| 1 | 05/18/2026 |
Counties Covered
This wage determination applies to 7 counties in Oklahoma.
Get notified when OK20260017 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.