OK20260017
rev 1Highway
54 trades
Applies to
Creek, Okmulgee, Osage, Pawnee, Rogers, Tulsa, Wagoner
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Get an email when wage determinations covering Wagoner County, Oklahoma are modified.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Click a row to save its rate for later, then export your selections from the Saved panel.
| Save | Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|---|
| BRICKLAYER Building BROK0005-004 | $26.92 | $13.09 | $40.01 | |
| BRICKLAYER Residential BROK0005-001 | $25.92 | $11.89 | $37.81 | |
| CARPENTER Residential SUOK2017-003 | $14.98 | 0.00 | $14.98 | |
| CARPENTER (DRYWALL HANGING ONLY) Building SUOK2012-035 | $15.07 | $1.22 | $16.29 | |
| CARPENTER, EXCLUDES DRYWALL HANGING, AND FORM WORK Building SUOK2012-035 | $14.58 | $1.57 | $16.15 | |
| CARPENTER, INCLUDES FORM WORK, AND CURB LINE FORMSETTING (REMAINING COUNTIES) Highway SUOK2011-004 | $13.24 | 0.00 | $13.24 | |
| CARPENTER, INCLUDES FORM WORK, AND CURB LINE FORMSETTING (ROGERS COUNTY) Highway SUOK2011-004 | $14.82 | 0.00 | $14.82 | |
| CARPENTER, INCLUDES FORM WORK, AND CURB LINE FORMSETTING (TULSA COUNTY) Highway SUOK2011-004 | $12.80 | 0.00 | $12.80 | |
| CAULKER Building SUOK2012-035 | $20.00 | $1.61 | $21.61 | |
| CEMENT MASON/CONCRETE FINISHER Heavy SUOK2012-008 | $14.00 | $3.95 | $17.95 | |
| CEMENT MASON/CONCRETE FINISHER Building SUOK2012-035 | $14.26 | $1.27 | $15.53 | |
| CEMENT MASON/CONCRETE FINISHER Residential SUOK2017-003 | $18.57 | 0.00 | $18.57 | |
| CEMENT MASON/CONCRETE FINISHER (REMAINING COUNTIES) Highway SUOK2011-004 | $13.36 | 0.00 | $13.36 | |
| CEMENT MASON/CONCRETE FINISHER (TULSA COUNTY) Highway SUOK2011-004 | $13.44 | 0.00 | $13.44 | |
| DRYWALL FINISHER/TAPER Building SUOK2012-035 | $13.00 | 0.00 | $13.00 | |
| ELECTRICIAN Heavy ELEC1002-005 | $51.00 | $23.80 | $74.80 | |
| ELECTRICIAN Building ELEC0584-006 (EXCLUDES LOW VOLTAGE WIRING AND INSTALLATION OF ALARMS AND SOUND AND COMMUNICATION SYSTEMS) | $38.38 | $12.89 | $51.27 | |
| ELECTRICIAN Building SUOK2012-035 (SOUND AND COMMUNICATIONS SYSTEMS INSTALLATION) | $20.66 | $2.64 | $23.30 | |
| ELECTRICIAN Residential SUOK2017-003 | $19.08 | 0.00 | $19.08 | |
| ELECTRICIAN (LOW VOLTAGE WIRING) Building SUOK2012-035 | $20.79 | $3.85 | $24.64 | |
| ELECTRICIAN: ALARM INSTALLATION Building SUOK2012-035 | $19.00 | $3.20 | $22.20 | |
| FORM WORKER Heavy SUOK2012-008 | $11.77 | 0.00 | $11.77 | |
| FORM WORKER Building SUOK2012-035 | $13.77 | $0.38 | $14.15 | |
| HVAC MECHANIC Building PLUM0430-019 (INSTALLATION OF HVAC UNIT ONLY, EXCLUDES INSTALLATION OF HVAC PIPE AND DUCT) | $36.65 | $16.03 | $52.68 | |
| IRONWORKER Heavy IRON0584-019 (STRUCTURAL, REINFORCING, AND ORNAMENTAL) | $30.35 | $16.83 | $47.18 | |
| IRONWORKER, STRUCTURAL Highway SUOK2011-004 | $14.21 | 0.00 | $14.21 | |
| IRONWORKER, STRUCTURAL Residential SUOK2017-003 | $17.10 | $4.22 | $21.32 | |
| IRONWORKER: ORNAMENTAL, REINFORCING AND STRUCTURAL Building IRON0584-025 | $30.35 | $16.83 | $47.18 | |
| IRONWORKER: REINFORCING Highway SUOK2011-004 | $15.38 | 0.00 | $15.38 | |
| LABORER Highway SUOK2011-004 (POWER TOOL OPERATOR (INCLUDES CHIPPING GUNS AND HANDHELD CONCRETE SAWS)) | $12.89 | 0.00 | $12.89 | |
| LABORER (LANDSCAPE) Highway SUOK2011-004 | $8.67 | 0.00 | $8.67 | |
| LABORER (PIPELAYER) Highway SUOK2011-004 | $12.35 | 0.00 | $12.35 | |
| LABORER, ASPHALT RAKER AND SHOVELER Highway SUOK2011-004 (REMAINING COUNTIES) | $12.40 | $1.57 | $13.97 | |
| LABORER, ASPHALT RAKER AND SHOVELER (ROGERS COUNTY) Highway SUOK2011-004 | $11.76 | $1.57 | $13.33 | |
| LABORER, COMMON OR GENERAL (CREEK COUNTY) Highway SUOK2011-004 | $10.95 | 0.00 | $10.95 | |
| LABORER, COMMON OR GENERAL (REMAINING COUNTIES) Highway SUOK2011-004 | $10.70 | 0.00 | $10.70 | |
| LABORER, COMMON OR GENERAL (ROGERS COUNTY) Highway SUOK2011-004 | $10.14 | 0.00 | $10.14 | |
| LABORER, COMMON OR GENERAL (TULSA COUNTY) Highway SUOK2011-004 | $10.84 | 0.00 | $10.84 | |
| LABORER, COMMON OR GENERAL (WAGONER) Highway SUOK2011-004 | $10.32 | 0.00 | $10.32 | |
| LABORER, TRAFFIC CONTROL Highway SUOK2011-004 (INCLUDES FLAGGER, SETTING UP AND MOVING CONES/BARRELS) (TULSA COUNTY) | $10.94 | 0.00 | $10.94 | |
| LABORER, TRAFFIC CONTROL Highway SUOK2011-004 (INCLUDES FLAGGER, SETTING UP AND MOVING CONES/BARRELS) (REMAINING COUNTIES) | $11.05 | 0.00 | $11.05 | |
| LABORER: COMMON OR GENERAL Heavy SUOK2012-008 | $11.78 | $2.76 | $14.54 | |
| LABORER: COMMON OR GENERAL Building SUOK2012-035 | $12.45 | $2.79 | $15.24 | |
| LABORER: COMMON OR GENERAL Residential SUOK2017-003 | $12.50 | 0.00 | $12.50 | |
| LABORER: MASON TENDER - BRICK Building SUOK2012-035 | $12.52 | 0.00 | $12.52 | |
| LABORER: MASON TENDER - CEMENT/CONCRETE Building SUOK2012-035 | $13.00 | $1.91 | $14.91 | |
| LABORER: PIPELAYER Heavy SUOK2012-008 | $12.94 | $2.42 | $15.36 | |
| LABORER: PIPELAYER Building SUOK2012-035 | $12.39 | 0.00 | $12.39 | |
| OPERATOR: ASPHALT PAVER Building SUOK2012-035 | $16.88 | 0.00 | $16.88 | |
| OPERATOR: BACKHOE/EXCAVATOR Heavy SUOK2012-008 | $16.62 | $3.10 | $19.72 | |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE Building SUOK2012-035 | $17.23 | $4.08 | $21.31 | |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE Residential SUOK2017-003 | $17.02 | $10.00 | $27.02 | |
| OPERATOR: BULLDOZER Heavy SUOK2012-008 | $17.98 | $1.75 | $19.73 | |
| OPERATOR: BULLDOZER Building SUOK2012-035 | $20.64 | $2.35 | $22.99 | |
| OPERATOR: DRILL Heavy SUOK2012-008 | $17.15 | $0.78 | $17.93 | |
| OPERATOR: GRADER/BLADE Heavy SUOK2012-008 | $17.76 | $3.87 | $21.63 | |
| OPERATOR: GRADER/BLADE Building SUOK2012-035 | $14.28 | $1.70 | $15.98 | |
| OPERATOR: LOADER (FRONT END) Heavy SUOK2012-008 | $14.01 | 0.00 | $14.01 | |
| OPERATOR: LOADER (FRONT END) Building SUOK2012-035 | $16.18 | 0.00 | $16.18 | |
| OPERATOR: MECHANIC Heavy SUOK2012-008 | $19.61 | $9.39 | $29.00 | |
| OPERATOR: SCRAPER Heavy SUOK2012-008 | $16.00 | $1.55 | $17.55 | |
| OPERATOR: TRACKHOE Heavy SUOK2012-008 | $18.54 | $2.78 | $21.32 | |
| PAINTER: BRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL FINISHING/TAPING Building SUOK2012-035 | $12.22 | 0.00 | $12.22 | |
| PIPEFITTER Building PLUM0430-020 (INCLUDING HVAC PIPE INSTALLATION, EXCLUDING HVAC UNIT INSTALLATION) | $36.65 | $16.03 | $52.68 | |
| PLUMBER Residential SUOK2017-003 | $33.14 | 0.00 | $33.14 | |
| PLUMBER (EXCLUDES HVAC PIPE AND UNIT INSTALLATION) Building PLUM0430-010 | $36.65 | $16.03 | $52.68 | |
| POWER EQUIPMENT OPERATOR: Highway SUOK2011-004 (ROLLER (DIRT COMPACTION)) | $11.71 | 0.00 | $11.71 | |
| POWER EQUIPMENT OPERATOR: (ASPHALT PAVER SCREED) Highway SUOK2011-004 | $12.96 | 0.00 | $12.96 | |
| POWER EQUIPMENT OPERATOR: (ASPHALT PAVING MACHINE) Highway SUOK2011-004 | $13.95 | $2.75 | $16.70 | |
| POWER EQUIPMENT OPERATOR: (BOBCAT/SKID LOADER) Highway SUOK2011-004 | $12.24 | 0.00 | $12.24 | |
| POWER EQUIPMENT OPERATOR: (BROOM) Highway SUOK2011-004 | $11.97 | 0.00 | $11.97 | |
| POWER EQUIPMENT OPERATOR: (BULLDOZER) Highway SUOK2011-004 | $14.28 | 0.00 | $14.28 | |
| POWER EQUIPMENT OPERATOR: (CONCRETE PAVING MACHINE) Highway SUOK2011-004 | $14.11 | 0.00 | $14.11 | |
| POWER EQUIPMENT OPERATOR: (CONCRETE SAW) Highway SUOK2011-004 | $11.94 | 0.00 | $11.94 | |
| POWER EQUIPMENT OPERATOR: (CRANE) Highway SUOK2011-004 | $17.45 | 0.00 | $17.45 | |
| POWER EQUIPMENT OPERATOR: (DISTRIBUTOR TRUCK) Highway SUOK2011-004 | $13.34 | 0.00 | $13.34 | |
| POWER EQUIPMENT OPERATOR: (EXCAVATOR) Highway SUOK2011-004 | $14.99 | 0.00 | $14.99 | |
| POWER EQUIPMENT OPERATOR: (GRADER/BLADE) Highway SUOK2011-004 | $16.68 | 0.00 | $16.68 | |
| POWER EQUIPMENT OPERATOR: (LOADER (FRONT END)) Highway SUOK2011-004 | $13.81 | 0.00 | $13.81 | |
| POWER EQUIPMENT OPERATOR: (MECHANIC) Highway SUOK2011-004 | $17.46 | 0.00 | $17.46 | |
| POWER EQUIPMENT OPERATOR: (MILLING MACHINE) Highway SUOK2011-004 | $14.56 | 0.00 | $14.56 | |
| POWER EQUIPMENT OPERATOR: (MIXER) Highway SUOK2011-004 | $14.43 | 0.00 | $14.43 | |
| POWER EQUIPMENT OPERATOR: (OILER) Highway SUOK2011-004 | $15.28 | 0.00 | $15.28 | |
| POWER EQUIPMENT OPERATOR: (ROLLER (ASPHALT)) Highway SUOK2011-004 | $12.79 | 0.00 | $12.79 | |
| POWER EQUIPMENT OPERATOR: (SCRAPER) Highway SUOK2011-004 | $13.34 | 0.00 | $13.34 | |
| POWER EQUIPMENT OPERATOR: (STRIPING MACHINE) Highway SUOK2011-004 | $11.94 | 0.00 | $11.94 | |
| POWER EQUIPMENT OPERATOR: (TRACTOR/BOX BLADE) Highway SUOK2011-004 | $13.67 | 0.00 | $13.67 | |
| POWER EQUIPMENT OPERATOR: (TRENCHER) Highway SUOK2011-004 | $13.87 | 0.00 | $13.87 | |
| POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE Highway SUOK2011-004 (TULSA COUNTY) | $15.19 | 0.00 | $15.19 | |
| POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE Highway SUOK2011-004 (ROGERS COUNTY) | $15.11 | 0.00 | $15.11 | |
| POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE Highway SUOK2011-004 (REMAINING COUNTIES) | $15.16 | 0.00 | $15.16 | |
| POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES Heavy ENGI0627-014 | $38.09 | $19.05 | $57.14 | |
| POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES Building ENGI0627-020 | $38.09 | $19.05 | $57.14 | |
| POWER EQUIPMENT OPERATOR: GROUP 10 OILER Heavy ENGI0627-014 | $27.25 | $19.05 | $46.30 | |
| POWER EQUIPMENT OPERATOR: GROUP 10 OILER; SEMI- TRAILER TRUCK DRIVER Building ENGI0627-020 | $27.25 | $19.05 | $46.30 | |
| POWER EQUIPMENT OPERATOR: GROUP 2 ALL CRANE TYPE EQUIPMENT 100 TON CAPACITY AND LARGER CRANES, AND LESS THAN 200 TON CAPACITY Heavy ENGI0627-014 | $36.14 | $19.05 | $55.19 | |
| POWER EQUIPMENT OPERATOR: GROUP 2 ALL CRANE TYPE EQUIPMENT 100 TON CAPACITY AND LARGER CRANES, AND LESS THAN 200 TON CAPACITY Building ENGI0627-020 | $36.14 | $19.05 | $55.19 | |
| POWER EQUIPMENT OPERATOR: GROUP 3 ALL CRANE TYPE EQUIPMENT 50 TON CAPACITY AND LARGER CRANES, AND LESS THAN 100 TON CAPACITY. CRANE EQUIPMENT Heavy ENGI0627-014 (AS RATED BY MFG.) 3 CU. YD. AND OVER GUY DERRICK WHIRLEY POWER DRIVEN HOLE DIGGER (WITH 30' AND LONGER MAST) | $35.40 | $19.05 | $54.45 | |
| POWER EQUIPMENT OPERATOR: GROUP 3 ALL CRANE TYPE EQUIPMENT 50 TON CAPACITY AND LARGER CRANES, AND LESS THAN 100 TON CAPACITY. CRANE EQUIPMENT Building ENGI0627-020 (AS RATED BY MFG.) 3 CU. YD. AND OVER GUY DERRICK WHIRLEY POWER DRIVEN HOLE DIGGER (WITH 30' AND LONGER MAST) | $35.40 | $19.05 | $54.45 | |
| POWER EQUIPMENT OPERATOR: GROUP 4 CRANES WITH BOOM INCL. JIB LESS THAN 100 FT AND LESS THAN 3 CU. YD.; OVERHEAD MONORAIL CRANE Heavy ENGI0627-014 | $34.07 | $19.05 | $53.12 | |
| POWER EQUIPMENT OPERATOR: GROUP 4 CRANES WITH BOOM INCL. JIB LESS THAN 100 FT AND LESS THAN 3 CU. YD.; OVERHEAD MONORAIL CRANE AND BULLDOZER Building ENGI0627-020 | $34.07 | $19.05 | $53.12 | |
| POWER EQUIPMENT OPERATOR: GROUP 6 ROLLER Heavy ENGI0627-014 (ASPHALT AND DIRT) | $30.87 | $19.05 | $49.92 | |
| POWER EQUIPMENT OPERATOR: GROUP 8 FORKLIFT Building ENGI0627-020 | $28.77 | $19.05 | $47.82 | |
| ROOFER Building ROOF0143-001 | $26.30 | $10.34 | $36.64 | |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) Building SHEE0270-006 | $35.49 | $14.60 | $50.09 | |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION Building SUOK2012-035 | $22.18 | $5.06 | $27.24 | |
| SPRINKLER FITTER (FIRE SPRINKLERS) Building SUOK2012-035 | $21.86 | $1.19 | $23.05 | |
| TRAFFIC SIGNAL INSTALLER Highway SUOK2011-004 | $18.04 | 0.00 | $18.04 | |
| TRUCK DRIVER (DUMP TRUCK) Highway SUOK2011-004 | $13.97 | 0.00 | $13.97 | |
| TRUCK DRIVER (FLATBED TRUCK) Highway SUOK2011-004 | $14.69 | 0.00 | $14.69 | |
| TRUCK DRIVER (LOWBOY/FLOAT) Highway SUOK2011-004 | $13.80 | 0.00 | $13.80 | |
| TRUCK DRIVER (OFF THE ROAD TRUCK) Highway SUOK2011-004 | $13.40 | 0.00 | $13.40 | |
| TRUCK DRIVER (PICKUP TRUCK) Highway SUOK2011-004 | $12.32 | 0.00 | $12.32 | |
| TRUCK DRIVER (WATER TRUCK) Highway SUOK2011-004 | $12.00 | 0.00 | $12.00 | |
| TRUCK DRIVER: DUMP AND FLATBED TRUCK Building SUOK2012-035 | $11.00 | 0.00 | $11.00 | |
| TRUCK DRIVER: DUMP TRUCK Heavy SUOK2012-008 | $14.64 | $1.71 | $16.35 | |
| TRUCK DRIVER: TANDEM AXLE/SEMI TRAILER Highway SUOK2011-004 (TULSA COUNTY) | $18.01 | 0.00 | $18.01 | |
| TRUCK DRIVER: TANDEM AXLE/SEMI TRAILER Highway SUOK2011-004 (ROGERS COUNTY) | $14.01 | $0.31 | $14.32 | |
| TRUCK DRIVER: TANDEM AXLE/SEMI TRAILER Highway SUOK2011-004 (REMAINING COUNTIES) | $16.36 | 0.00 | $16.36 |
No trade rates match your search and filter selection.
Highway
Applies to
Creek, Okmulgee, Osage, Pawnee, Rogers, Tulsa, Wagoner
Heavy
Applies to
Creek, Okmulgee, Osage, Pawnee, Rogers, Wagoner
Building
Applies to
Okmulgee, Wagoner
Residential