OK20260017
rev 0Highway
0 trades
Applies to
Creek, Okmulgee, Osage, Pawnee, Rogers, Tulsa, Wagoner in Oklahoma.
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Click any row to save it for later
| Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER Highway SUOK2011-004 (Includes Form Work, and Curb Line Formsetting) Remaining Counties | $13.24 | $0.00 | $13.24 |
| CEMENT MASON/CONCRETE FINISHER Remaining Counties Highway SUOK2011-004 | $13.36 | $0.00 | $13.36 |
| IRONWORKER, REINFORCING Highway SUOK2011-004 | $15.38 | $0.00 | $15.38 |
| IRONWORKER, STRUCTURAL Highway SUOK2011-004 | $14.21 | $0.00 | $14.21 |
| LABORER Asphalt Raker and Shoveler Remaining Counties Highway SUOK2011-004 | $12.40 | $1.57 | $13.97 |
| Landscape Highway SUOK2011-004 | $8.67 | $0.00 | $8.67 |
| Pipelayer Highway SUOK2011-004 | $12.35 | $0.00 | $12.35 |
| POWER EQUIPMENT OPERATOR: Asphalt Paver Screed Highway SUOK2011-004 | $12.96 | $0.00 | $12.96 |
| POWER EQUIPMENT OPERATOR: Asphalt Paving Machine Highway SUOK2011-004 | $13.95 | $2.75 | $16.70 |
| POWER EQUIPMENT OPERATOR: Backhoe/Trackhoe Remaining Counties Highway SUOK2011-004 | $15.16 | $0.00 | $15.16 |
| POWER EQUIPMENT OPERATOR: Bobcat/Skid Loader Highway SUOK2011-004 | $12.24 | $0.00 | $12.24 |
| POWER EQUIPMENT OPERATOR: Broom Highway SUOK2011-004 | $11.97 | $0.00 | $11.97 |
| POWER EQUIPMENT OPERATOR: Bulldozer Highway SUOK2011-004 | $14.28 | $0.00 | $14.28 |
| POWER EQUIPMENT OPERATOR: Concrete Paving Machine Highway SUOK2011-004 | $14.11 | $0.00 | $14.11 |
| POWER EQUIPMENT OPERATOR: Concrete Saw Highway SUOK2011-004 | $11.94 | $0.00 | $11.94 |
| POWER EQUIPMENT OPERATOR: Crane Highway SUOK2011-004 | $17.45 | $0.00 | $17.45 |
| POWER EQUIPMENT OPERATOR: Distributor Truck Highway SUOK2011-004 | $13.34 | $0.00 | $13.34 |
| POWER EQUIPMENT OPERATOR: Excavator Highway SUOK2011-004 | $14.99 | $0.00 | $14.99 |
| POWER EQUIPMENT OPERATOR: Flatbed Truck Highway SUOK2011-004 | $14.69 | $0.00 | $14.69 |
| POWER EQUIPMENT OPERATOR: Grader/Blade Highway SUOK2011-004 | $16.68 | $0.00 | $16.68 |
| POWER EQUIPMENT OPERATOR: Loader (Front End) Highway SUOK2011-004 | $13.81 | $0.00 | $13.81 |
| POWER EQUIPMENT OPERATOR: Lowboy/Float Highway SUOK2011-004 | $13.80 | $0.00 | $13.80 |
| POWER EQUIPMENT OPERATOR: Mechanic Highway SUOK2011-004 | $17.46 | $0.00 | $17.46 |
| POWER EQUIPMENT OPERATOR: Milling Machine Highway SUOK2011-004 | $14.56 | $0.00 | $14.56 |
| POWER EQUIPMENT OPERATOR: Mixer Highway SUOK2011-004 | $14.43 | $0.00 | $14.43 |
| POWER EQUIPMENT OPERATOR: Off the Road Truck Highway SUOK2011-004 | $13.40 | $0.00 | $13.40 |
| POWER EQUIPMENT OPERATOR: Oiler Highway SUOK2011-004 | $15.28 | $0.00 | $15.28 |
| POWER EQUIPMENT OPERATOR: Pickup Truck Highway SUOK2011-004 | $12.32 | $0.00 | $12.32 |
| POWER EQUIPMENT OPERATOR: Roller (Asphalt) Highway SUOK2011-004 | $12.79 | $0.00 | $12.79 |
| POWER EQUIPMENT OPERATOR: Roller (Dirt Compaction) Highway SUOK2011-004 | $11.71 | $0.00 | $11.71 |
| POWER EQUIPMENT OPERATOR: Scraper Highway SUOK2011-004 | $13.34 | $0.00 | $13.34 |
| POWER EQUIPMENT OPERATOR: Striping Machine Highway SUOK2011-004 | $11.94 | $0.00 | $11.94 |
| POWER EQUIPMENT OPERATOR: Tandem Axle/Semi Trailer Remaining Counties Highway SUOK2011-004 | $16.36 | $0.00 | $16.36 |
| POWER EQUIPMENT OPERATOR: Tractor/Box Blade Highway SUOK2011-004 | $13.67 | $0.00 | $13.67 |
| POWER EQUIPMENT OPERATOR: Trencher Highway SUOK2011-004 | $13.87 | $0.00 | $13.87 |
| POWER EQUIPMENT OPERATOR: TRUCK DRIVER Dump Truck Highway SUOK2011-004 | $13.97 | $0.00 | $13.97 |
| POWER EQUIPMENT OPERATOR: Water Truck Highway SUOK2011-004 | $12.00 | $0.00 | $12.00 |
| Power Tool Operator Highway SUOK2011-004 (Includes Chipping Guns and Handheld Concrete Saws) | $12.89 | $0.00 | $12.89 |
| Remaining Counties Highway SUOK2011-004 | $10.70 | $0.00 | $10.70 |
| Traffic Control Highway SUOK2011-004 (Includes Flagger, Setting Up and Moving Cones/Barrels) Remaining Counties | $11.05 | $0.00 | $11.05 |
| Traffic signal installer Highway SUOK2011-004 | $18.04 | $0.00 | $18.04 |
| Wagoner Highway SUOK2011-004 | $10.32 | $0.00 | $10.32 |
No trade rates match your search and filter selection.
Highway
Applies to
Creek, Okmulgee, Osage, Pawnee, Rogers, Tulsa, Wagoner in Oklahoma.