SC20260001
rev 1Heavy
Applies to
Abbeville, Allendale, Bamberg, Barnwell, Beaufort, Cherokee, Chester, Chesterfield, Clarendon, Colleton +15 more
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Get an email when wage determinations covering Allendale County, South Carolina are modified.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Click a row to save its rate for later, then export your selections from the Saved panel.
| Save | Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|---|
| ASBESTOS ABATEMENT WORKER/HAZARDOUS MATERIAL HANDLER Building SUSC2011-002 (INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS FROM MECHANICAL SYSTEMS, WHETHER THEY CONTAIN ASBESTOS OR NOT) | $16.00 | $0.25 | $16.25 | |
| ASBESTOS WORKER/INSULATOR Building SUSC2011-002 (INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS & FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS) | $32.00 | $22.49 | $54.49 | |
| BOILERMAKER Building SUSC2011-002 | $34.21 | $24.26 | $58.47 | |
| BOILERMAKER (TANK WORK) Heavy SUSC1990-005 | $12.96 | $3.32 | $16.28 | |
| BRICKLAYER Heavy SUSC1990-005 | $7.25 | 0.00 | $7.25 | |
| BRICKLAYER Building SUSC2011-002 | $29.70 | $16.85 | $46.55 | |
| BRICKLAYER Residential SUSC2017-003 | $7.25 | 0.00 | $7.25 | |
| CARPENTER Heavy SUSC1990-005 | $7.42 | 0.00 | $7.42 | |
| CARPENTER Building SUSC2011-002 | $34.15 | $15.44 | $49.59 | |
| CARPENTER Residential SUSC2017-003 | $7.25 | 0.00 | $7.25 | |
| CARPENTER, EXCLUDES FORM WORK Building SUSC2011-014 | $15.42 | 0.00 | $15.42 | |
| CEMENT MASON Building SUSC2011-002 | $28.74 | $16.73 | $45.47 | |
| CEMENT MASON/CONCRETE FINISHER Heavy SUSC1990-005 | $7.25 | 0.00 | $7.25 | |
| CONCRETE FINISHER Residential SUSC2017-003 | $7.25 | 0.00 | $7.25 | |
| DRYWALL FINISHER Residential SUSC2017-003 | $7.25 | 0.00 | $7.25 | |
| DRYWALL HANGER Residential SUSC2017-003 | $7.25 | 0.00 | $7.25 | |
| ELECTRICIAN Building SUSC2011-014 | $19.99 | $4.04 | $24.03 | |
| ELECTRICIAN Residential SUSC2017-003 | $7.25 | 0.00 | $7.25 | |
| ELECTRICIAN (CABLE SPLICER) Building SUSC2011-002 | $37.00 | $17.74 | $54.74 | |
| ELECTRICIAN (GROUNDMAN) Building SUSC2011-002 | $24.31 | $17.74 | $42.05 | |
| ELECTRICIAN (LINEMAN) Building SUSC2011-002 | $35.75 | $17.74 | $53.49 | |
| ELEVATOR CONSTRUCTOR Building SUSC2011-002 | $51.11 | $40.04 | $91.15 | |
| FORM WORKER Building SUSC2011-014 | $14.08 | 0.00 | $14.08 | |
| GLAZIER Building SUSC2011-002 | $29.27 | $14.55 | $43.82 | |
| HVAC MECHANIC/DUCT & PIPE Residential SUSC2017-003 | $7.25 | 0.00 | $7.25 | |
| INSULATOR/ASBESTOS WORKER Residential SUSC2017-003 | $7.25 | 0.00 | $7.25 | |
| IRONWORKER Heavy SUSC1990-005 | $10.98 | 0.00 | $10.98 | |
| IRONWORKER Building SUSC2011-002 | $35.72 | $15.72 | $51.44 | |
| LABORER: COMMON OR GENERAL Building SUSC2011-014 | $10.62 | $0.55 | $11.17 | |
| LABORER: PIPELAYER Building SUSC2011-014 | $12.50 | $1.23 | $13.73 | |
| LABORERS: (CHAIN SAW) Heavy SUSC1990-005 | $7.25 | 0.00 | $7.25 | |
| LABORERS: (CONCRETE & BUILDING) Building SUSC2011-002 | $22.57 | $13.22 | $35.79 | |
| LABORERS: (GENERAL) Residential SUSC2017-003 | $7.25 | 0.00 | $7.25 | |
| LABORERS: (HAZARDOUS WASTE VERIFIER) Building SUSC2011-002 | $23.32 | $13.22 | $36.54 | |
| LABORERS: (MORTAR MIXER) Building SUSC2011-002 | $22.82 | $13.22 | $36.04 | |
| LABORERS: (MORTAR MIXER) Residential SUSC2017-003 | $7.25 | 0.00 | $7.25 | |
| LABORERS: (NOZZLEPERSON) Building SUSC2011-002 | $23.07 | $13.22 | $36.29 | |
| LABORERS: (PIPELAYER) Heavy SUSC1990-005 | $7.25 | 0.00 | $7.25 | |
| LABORERS: (PIPELAYER) Building SUSC2011-002 | $22.82 | $13.22 | $36.04 | |
| LABORERS: (PIPELAYER) Residential SUSC2017-003 | $7.25 | 0.00 | $7.25 | |
| LABORERS: (PNEUMATIC CONCRETE GUN OPERATOR) Building SUSC2011-002 | $23.07 | $13.22 | $36.29 | |
| LABORERS: (PNEUMATIC TOOL OPERATOR) Building SUSC2011-002 | $22.82 | $13.22 | $36.04 | |
| LABORERS: (TOOL FACILITY OPERATOR) Building SUSC2011-002 | $23.32 | $13.22 | $36.54 | |
| LABORERS: GENERAL Heavy SUSC1990-005 | $7.25 | 0.00 | $7.25 | |
| LINE CONSTRUCTION: LINE TECHNICIAN Heavy SUSC1990-005 | $10.08 | 0.00 | $10.08 | |
| MACHINIST Building SUSC2011-002 | $54.00 | $10.70 | $64.70 | |
| MANHOLE BUILDER Heavy SUSC1990-005 | $7.25 | 0.00 | $7.25 | |
| MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: COOK Heavy ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55 | $8.11 | $1.73 | $9.84 | |
| MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: COOK Heavy ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55 | $8.11 | $1.73 | $9.84 | |
| MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: DECKHAND Heavy ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55 | $7.77 | $1.73 | $9.50 | |
| MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: DECKHAND Heavy ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55 | $7.77 | $1.73 | $9.50 | |
| MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: DREDGING :, HYDRAULIC DREDGES OVER 20"": CLASS A2: CRANE OPERATOR Heavy ENGI0025-002 (360 SWING) . PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: A. NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55 | $43.20 | $14.99 | $58.19 | |
| MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: DREDGING :, HYDRAULIC DREDGES OVER 20"": CLASS A2: CRANE OPERATOR Heavy ENGI0025-002 (360 SWING) . PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: A. NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55 | $43.20 | $14.99 | $58.19 | |
| MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: DREDGING :, HYDRAULIC DREDGES OVER 20"": CLASS B1: DERRICK OPERATOR Heavy ENGI0025-002 (180 SWING), SPIDER/SPILL BARGE OPERATOR, TIMBER FORK OPERATOR, DOZER OPERATOR, ENGINEER, BLASTER/DRILLER, FILL PLACER, ELECTRICIAN, LICENSED BOAT OPERATOR, LICENSED CREW BOAT OPERATOR. PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: A. NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR LICENSED ENGINEER (USCG) $1.80; OILER QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS TANKERMAN ENDORSEMENT ONLY (USCG) (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55 | $41.93 | $14.90 | $56.83 | |
| MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: DREDGING :, HYDRAULIC DREDGES OVER 20"": CLASS B1: DERRICK OPERATOR Heavy ENGI0025-002 (180 SWING), SPIDER/SPILL BARGE OPERATOR, TIMBER FORK OPERATOR, DOZER OPERATOR, ENGINEER, BLASTER/DRILLER, FILL PLACER, ELECTRICIAN, LICENSED BOAT OPERATOR, LICENSED CREW BOAT OPERATOR. PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: A. NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR LICENSED ENGINEER (USCG) $1.80; OILER QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS TANKERMAN ENDORSEMENT ONLY (USCG) (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55 | $41.93 | $14.90 | $56.83 | |
| MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: DREDGING :, HYDRAULIC DREDGES OVER 20"": CLASS C1: MATE, DRAG BARGE OPERATOR, WELDER, ASSISTANT FILL PLACER, STEWARD Heavy ENGI0025-002 Scope differs by code/WD | $38.38 | $14.66 | $53.04 | |
| MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: DREDGING :, HYDRAULIC DREDGES OVER 20"": CLASS C1: MATE, DRAG BARGE OPERATOR, WELDER, ASSISTANT FILL PLACER, STEWARD Heavy ENGI0025-002 Scope differs by code/WD | $38.38 | $14.66 | $53.04 | |
| MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: ENGINEER Heavy ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55 | $9.59 | $1.73 | $11.32 | |
| MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: ENGINEER Heavy ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55 | $9.59 | $1.73 | $11.32 | |
| MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: LAUNCHMAN Heavy ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55 | $8.19 | $1.73 | $9.92 | |
| MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: LAUNCHMAN Heavy ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55 | $8.19 | $1.73 | $9.92 | |
| MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: LEVERMAN Heavy ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55 | $10.03 | $1.73 | $11.76 | |
| MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: LEVERMAN Heavy ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55 | $10.03 | $1.73 | $11.76 | |
| MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: MATE Heavy ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55 | $8.82 | $1.73 | $10.55 | |
| MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: MATE Heavy ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55 | $8.82 | $1.73 | $10.55 | |
| MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: MESS COOK Heavy ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55 | $7.71 | $1.73 | $9.44 | |
| MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: MESS COOK Heavy ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55 | $7.71 | $1.73 | $9.44 | |
| MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: MESSMAN & JANITOR Heavy ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: A. NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55 | $7.53 | $1.73 | $9.26 | |
| MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: MESSMAN & JANITOR Heavy ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: A. NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55 | $7.53 | $1.73 | $9.26 | |
| MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: OILER & FIREMAN (HYDRAULIC DREDGES UNDER 20"") Heavy ENGI0025-002 Scope differs by code/WD | $8.11 | $1.73 | $9.84 | |
| MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: OILER & FIREMAN (HYDRAULIC DREDGES UNDER 20"") Heavy ENGI0025-002 Scope differs by code/WD | $8.11 | $1.73 | $9.84 | |
| MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: SHOREMAN Heavy ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55 | $7.82 | $1.73 | $9.55 | |
| MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: SHOREMAN Heavy ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55 | $7.82 | $1.73 | $9.55 | |
| MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: SPIDER BARGE OPERATOR Heavy ENGI0025-002 (HYDRAULIC DREDGES UNDER 20"").PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS A. NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55 | $8.68 | $1.73 | $10.41 | |
| MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: SPIDER BARGE OPERATOR Heavy ENGI0025-002 (HYDRAULIC DREDGES UNDER 20"").PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS A. NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55 | $8.68 | $1.73 | $10.41 | |
| MILLWRIGHT Building SUSC2011-002 | $35.05 | $20.09 | $55.14 | |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE Building SUSC2011-014 | $16.39 | $1.83 | $18.22 | |
| PAINTER Building SUSC2011-002 (COMPOSITE RATE APPLIES TO ALL WORK PERFORMED BY JOURNEYMAN PAINTERS AND SIGN PAINTERS EXCEPT WHEN ENGAGED IN INDUSTRIAL PREMIUM WORK.) | $29.27 | $14.55 | $43.82 | |
| PAINTER, BRUSH Residential SUSC2017-003 | $7.25 | 0.00 | $7.25 | |
| PAINTER: BRUSH, ROLLER AND SPRAY Building SUSC2011-014 | $13.50 | 0.00 | $13.50 | |
| PILEDRIVER Building SUSC2011-002 | $34.40 | $15.44 | $49.84 | |
| PIPEFITTER Heavy SUSC1990-005 | $9.09 | 0.00 | $9.09 | |
| PIPEFITTER Building SUSC2011-002 Scope differs by code/WD | $39.06 | $17.41 | $56.47 | |
| PIPEFITTER Building SUSC2011-014 Scope differs by code/WD | $18.95 | $3.39 | $22.34 | |
| PLASTERER Building SUSC2011-002 | $28.74 | $16.73 | $45.47 | |
| PLUMBER Building SUSC2011-014 | $16.99 | $2.17 | $19.16 | |
| PLUMBER/PIPEFITTER Residential SUSC2017-003 | $7.25 | 0.00 | $7.25 | |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE Highway SUSC2011-038 (GEORGETOWN, HAMPTON, JASPER, WILLIAMSBURG) | $17.23 | 0.00 | $17.23 | |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE Highway SUSC2011-038 (ALLENDALE, BAMBERG, BARNWELL, NEWBERRY, ORANGEBURG) | $17.56 | 0.00 | $17.56 | |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (BEAUFORT) Highway SUSC2011-038 | $15.20 | 0.00 | $15.20 | |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (COLLETON) Highway SUSC2011-038 | $17.78 | 0.00 | $17.78 | |
| POWER EQUIPMENT OPERATOR: CARPENTER (FORM WORK ONLY) Highway SUSC2011-038 | $14.47 | 0.00 | $14.47 | |
| POWER EQUIPMENT OPERATOR: CEMENT MASON/CONCRETE FINISHER Highway SUSC2011-038 | $14.11 | 0.00 | $14.11 | |
| POWER EQUIPMENT OPERATOR: IRONWORKER, REINFORCING Highway SUSC2011-038 | $15.64 | 0.00 | $15.64 | |
| POWER EQUIPMENT OPERATOR: LABORER Highway SUSC2011-038 (ASPHALT, INCLUDES ASPHALT DISTRIBUTOR, RAKER, SHOVERLER, AND SPREADER) | $10.96 | 0.00 | $10.96 | |
| POWER EQUIPMENT OPERATOR: LABORER (COLLETON) Highway SUSC2011-038 | $10.16 | 0.00 | $10.16 | |
| POWER EQUIPMENT OPERATOR: LABORER (LUTEMAN) Highway SUSC2011-038 | $11.71 | 0.00 | $11.71 | |
| POWER EQUIPMENT OPERATOR: LABORER (PIPELAYER) Highway SUSC2011-038 | $13.87 | 0.00 | $13.87 | |
| POWER EQUIPMENT OPERATOR: LABORER (TRAFFIC CONTROL-FLAGGER) Highway SUSC2011-038 | $11.68 | 0.00 | $11.68 | |
| POWER EQUIPMENT OPERATOR: LABORER, COMMON OR GENERAL Highway SUSC2011-038 (NEWBERRY, ALLENDALE, BAMBERG, BARNWELL) | $11.82 | 0.00 | $11.82 | |
| POWER EQUIPMENT OPERATOR: LABORER, COMMON OR GENERAL Highway SUSC2011-038 (GEORGETOWN, HAMPTON, JASPER) | $10.07 | 0.00 | $10.07 | |
| POWER EQUIPMENT OPERATOR: LABORER, COMMON OR GENERAL (BEAUFORT) Highway SUSC2011-038 | $10.15 | 0.00 | $10.15 | |
| POWER EQUIPMENT OPERATOR: LABORER, COMMON OR GENERAL (COLLETON) Highway SUSC2011-038 | $10.16 | 0.00 | $10.16 | |
| POWER EQUIPMENT OPERATOR: LABORER, COMMON OR GENERAL (ORANGEBURG) Highway SUSC2011-038 | $12.63 | 0.00 | $12.63 | |
| POWER EQUIPMENT OPERATOR: LABORER, COMMON OR GENERAL (WILLIAMSBURG) Highway SUSC2011-038 | $10.01 | 0.00 | $10.01 | |
| POWER EQUIPMENT OPERATOR: LABORER, TRAFFIC CONTROL-CONE SETTER Highway SUSC2011-038 (BEAUFORT, COLLETON, GEORGETOWN, HAMPTON, JASPER, WILLIAMSBURG) | $12.84 | 0.00 | $12.84 | |
| POWER EQUIPMENT OPERATOR: LABORER, TRAFFIC CONTROL-CONE SETTER Highway SUSC2011-038 (ALLENDALE, BAMBER, BARNWELL, NEWBERRY, ORANGEBURG) | $12.98 | 0.00 | $12.98 | |
| POWER EQUIPMENT OPERATOR: PAVER Highway SUSC2011-038 (COLLETON, GEORGETOWN, HAMPTON, JASPER) | $13.67 | 0.00 | $13.67 | |
| POWER EQUIPMENT OPERATOR: PAVER Highway SUSC2011-038 (ALLENDALE, BAMBERG, BARNWELL, NEWBERRY, ORANGEBURG, WILLIAMSBURG) | $15.01 | 0.00 | $15.01 | |
| POWER EQUIPMENT OPERATOR: PAVER (BEAUFORT) Highway SUSC2011-038 | $14.96 | 0.00 | $14.96 | |
| POWER EQUIPMENT OPERATOR: POWER EQUIPMENT OPERATOR: (BULLDOZER) Highway SUSC2011-038 | $20.12 | 0.00 | $20.12 | |
| POWER EQUIPMENT OPERATOR: POWER EQUIPMENT OPERATOR: (CRANE) Highway SUSC2011-038 | $16.62 | 0.00 | $16.62 | |
| POWER EQUIPMENT OPERATOR: POWER EQUIPMENT OPERATOR: (GRADER/BLADE) Highway SUSC2011-038 | $16.62 | 0.00 | $16.62 | |
| POWER EQUIPMENT OPERATOR: POWER EQUIPMENT OPERATOR: (LOADER (FRONT END)) Highway SUSC2011-038 | $15.51 | 0.00 | $15.51 | |
| POWER EQUIPMENT OPERATOR: POWER EQUIPMENT OPERATOR: (MECHANIC) Highway SUSC2011-038 | $18.22 | 0.00 | $18.22 | |
| POWER EQUIPMENT OPERATOR: POWER EQUIPMENT OPERATOR: (MILLING MACHINE) Highway SUSC2011-038 | $18.83 | 0.00 | $18.83 | |
| POWER EQUIPMENT OPERATOR: POWER EQUIPMENT OPERATOR: (ROLLER) Highway SUSC2011-038 | $12.76 | 0.00 | $12.76 | |
| POWER EQUIPMENT OPERATOR: POWER EQUIPMENT OPERATOR: (SCREED) Highway SUSC2011-038 | $13.01 | 0.00 | $13.01 | |
| POWER EQUIPMENT OPERATOR: POWER EQUIPMENT OPERATOR: (TRACTOR) Highway SUSC2011-038 | $13.26 | 0.00 | $13.26 | |
| POWER EQUIPMENT OPERATORS: Building SUSC2011-002 (PUMP (2-1/2 IN. AND OVER); TRACTOR (UNDER 50 HP); FIREPERSON (BOILER); OILER) | $26.28 | $18.42 | $44.70 | |
| POWER EQUIPMENT OPERATORS: Building SUSC2011-002 (MECHANIC (DIESEL & GAS)) | $36.00 | $18.42 | $54.42 | |
| POWER EQUIPMENT OPERATORS: Building SUSC2011-002 (BATCH PLANT; BULLDOZER; CONCRETE MIXER (OVER 10 S); DISTRIBUTOR (BITUMINOUS SURFACES); END LOADER; FORK LIFT TRUCK; LEAD OILER; PAN SCRAPER; PAVING MACHINE; PUMPCRETE; TRENCHING MACHINE; WELL DRILL) | $33.12 | $18.42 | $51.54 | |
| POWER EQUIPMENT OPERATORS: Building SUSC2011-002 (BACKHOE; CENTRAL MIXING PLANT; CONCRETE PLACING MACHINE; CRANE, DERRICK, DRAGLINE; HOIST, 2-DRUM; MOTOR GRADER; SHOVEL; SIDEBOOM TRACTOR; TOWER/PEDESTAL CRANE; HOIST, 1-DRUM (HOISTING PERSONNEL); MECHANIC (DIESEL & GAS); MAXI GRINDER) | $36.00 | $18.42 | $54.42 | |
| POWER EQUIPMENT OPERATORS: Building SUSC2011-002 (AIR COMPRESSOR; CONCRETE MIXER (10 S OR LESS); CONVEYOR; ELEVATOR; HOIST, 1-DRUM; LIGHT PLANT; MOTOR CRANE DRIVER AND OILER; ROLLER; TRACTOR (50 HP AND OVER)) | $29.88 | $18.42 | $48.30 | |
| POWER EQUIPMENT OPERATORS: (BACKHOE) Heavy SUSC1990-005 | $7.25 | 0.00 | $7.25 | |
| POWER EQUIPMENT OPERATORS: (BULLDOZER) Residential SUSC2017-003 | $7.25 | 0.00 | $7.25 | |
| POWER EQUIPMENT OPERATORS: (FIREMAN (BOILER)) Building SUSC2011-002 | $26.28 | $18.42 | $44.70 | |
| POWER EQUIPMENT OPERATORS: (OILER) Building SUSC2011-002 | $26.28 | $18.42 | $44.70 | |
| POWER EQUIPMENT OPERATORS: (PAN SCRAPER) Heavy SUSC1990-005 | $7.25 | 0.00 | $7.25 | |
| POWER EQUIPMENT OPERATORS: BACKHOE Residential SUSC2017-003 | $7.25 | 0.00 | $7.25 | |
| POWER EQUIPMENT OPERATORS: BULLDOZER Heavy SUSC1990-005 | $7.25 | 0.00 | $7.25 | |
| POWER EQUIPMENT OPERATORS: CRANE Heavy SUSC1990-005 | $7.98 | 0.00 | $7.98 | |
| POWER EQUIPMENT OPERATORS: DRAGLINE Heavy SUSC1990-005 | $7.25 | 0.00 | $7.25 | |
| POWER EQUIPMENT OPERATORS: FRONT END LOADER Heavy SUSC1990-005 | $7.25 | 0.00 | $7.25 | |
| POWER EQUIPMENT OPERATORS: MECHANIC Heavy SUSC1990-005 | $7.25 | 0.00 | $7.25 | |
| POWER EQUIPMENT OPERATORS: MOTOR GRADER Heavy SUSC1990-005 | $7.25 | 0.00 | $7.25 | |
| ROOFER Residential SUSC2017-003 | $7.25 | 0.00 | $7.25 | |
| ROOFER (BUILT-UP, COMPOSITION AND WATERPROOFING) Building SUSC2011-002 | $29.00 | $9.90 | $38.90 | |
| SHEET METAL WORKER Building SUSC2011-002 | $37.00 | $18.11 | $55.11 | |
| SHEET METAL WORKER Residential SUSC2017-003 | $7.25 | 0.00 | $7.25 | |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) Building SUSC2011-014 | $19.15 | $1.15 | $20.30 | |
| SOFT FLOOR LAYER Residential SUSC2017-003 | $7.25 | 0.00 | $7.25 | |
| SPILL BARGE OPERATOR Heavy ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: A. NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55 | $8.68 | $1.73 | $10.41 | |
| SPILL BARGE OPERATOR Heavy ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: A. NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55 | $8.68 | $1.73 | $10.41 | |
| SPRINKLER FITTER Building SUSC2011-002 | $37.22 | $24.25 | $61.47 | |
| TILE SETTER Building SUSC2011-002 | $29.70 | $16.85 | $46.55 | |
| TILE SETTER Residential SUSC2017-003 | $7.25 | 0.00 | $7.25 | |
| TRUCK DRIVER Heavy SUSC1990-005 | $7.25 | 0.00 | $7.25 | |
| TRUCK DRIVER Building SUSC2011-014 | $12.76 | $2.04 | $14.80 | |
| TRUCK DRIVER Residential SUSC2017-003 | $7.25 | 0.00 | $7.25 | |
| TRUCK DRIVER (DUMP TRUCK) Highway SUSC2011-038 | $12.00 | 0.00 | $12.00 | |
| TRUCK DRIVER (LOWBOY TRUCK) Highway SUSC2011-038 | $14.43 | 0.00 | $14.43 | |
| TRUCK DRIVER (SINGLE AXLE, INCLUDES PILOT CAR) Highway SUSC2011-038 | $12.04 | 0.00 | $12.04 | |
| TRUCK DRIVER (TRACTOR HAUL TRUCK) Highway SUSC2011-038 | $16.25 | 0.00 | $16.25 | |
| TRUCK DRIVERS: 2-1/2 TONS & OVER, AND SPECIAL EQUIPMENT FOOTNOTE: HEALTH & WELFARE WEEKLY RATE: $393.90 Building SUSC2011-002 | $32.14 | $12.68 | $44.82 | |
| TRUCK DRIVERS: OILER Building SUSC2011-002 (LIGHT EQUIPMENT & GARAGE ATTENDANT) FOOTNOTE: HEALTH & WELFARE WEEKLY RATE: $393.90 | $31.79 | $12.68 | $44.47 | |
| TRUCK DRIVERS: UNDER 2-1/2 TONS FOOTNOTE: HEALTH & WELFARE WEEKLY RATE: $393.90 Building SUSC2011-002 | $31.51 | $12.68 | $44.19 | |
| WELDER Heavy ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55 | $9.79 | $1.73 | $11.52 | |
| WELDER Heavy ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55 | $9.79 | $1.73 | $11.52 |
No trade rates match your search and filter selection.
Heavy
Applies to
Abbeville, Allendale, Bamberg, Barnwell, Beaufort, Cherokee, Chester, Chesterfield, Clarendon, Colleton +15 more
Building, Heavy, Highway
Applies to
Aiken, Allendale, Barnwell
Heavy
Applies to
Abbeville, Aiken, Allendale, Anderson, Bamberg, Barnwell, Beaufort, Berkeley, Calhoun, Charleston +36 more
Building
Applies to
Allendale, Bamberg
Highway
Applies to
Allendale, Bamberg, Barnwell, Beaufort, Colleton, Georgetown, Hampton, Jasper, Newberry, Orangeburg +1 more
Residential
Applies to
Allendale, Bamberg, Barnwell, Orangeburg